Design & build of Buhimba-Nalweyo Bulamagi and Bulamagi-Igayaza-Kakumiro road (93km)
Project Description
Subcontract from LEA Associates South Asia Pvt. Ltd, the main designer under the Design & Build contract, to undertake designs for the upgrading of a 93km gravel road to paved standard.
Services Rendered
Condition assessment, topographic surveys, geometric designs and cost estimation.
Highlights
- Project Sum: UGX 2,919,836,093 (Subcontract)
- Client: Uganda National Roads Authority (UNRA) funded by ICBC (China)
- Status: 2018 – Ongoing