Project Title

Feasibility Study and Detailed Engineering Design of Nebbi – Goli - Paidha-Zombo-Warr-Vurra Road (119km)

Project Description

Detailed design and tender documentation of Goli – Paidha – Zombo – Warr – Vurra Road (95Km) Road and Arua Lia Road (15Km) for upgrading from gravel to bituminous standard connecting Uganda to the Democratic Republic of Congo.

Services Rendered

Feasibility study including route & pavement options, environmental & social-economic assessment, road safety, Land Acquisition, detailed Design, Tender Documentation, Resettlement Action Plan, Environmental and Social Impact Assessment.

Highlights

  • Project Sum: US $ 1,035,391.00
  • Client: Uganda National Roads Authority (UNRA)
  • Status: 2018 – Ongoing